Framework overview
Limitations register

What OCC does not claim

An assurance body is only as credible as its account of its own limits. This page sets them out plainly, and it is updated whenever our status changes.

Non-claims

Things that are not true — yet, or at all

  • OCC does not offer certification. “GUARD 4 Certified” is a reserved level; an OCC certification scheme is proposed, not operating.
  • No government, regulator, university or international body has endorsed OCC or its standards.
  • OCC is not affiliated with the United Nations, UNESCO or any intergovernmental organisation.
  • The Open Conformance Foundation is being established. Incorporation is targeted for Q4 2026 – Q1 2027; it does not yet exist as a legal entity.
  • Registry entries marked self-declared have not been independently checked.
  • A horizon classification is not a safety rating, a licence or a statement about consciousness or legal personhood.
  • Society OS Pty Ltd holds one pending Australian provisional patent application (2026900773, filed 2 Feb 2026, unexamined). The claims that read on the standards are covered by an irrevocable royalty-free pledge. No patent has been granted.
Known limitations

Where the standards and drafts fall short

AIH-12 upper horizons are conceptual

H9–H12 describe possibilities, not systems that have been observed. They exist so that oversight can be discussed before it is needed.

Self-reported evidence may be incomplete

Declarations rely on what implementers disclose. Gaps, omissions and optimism are expected; the evidence class shows how far a claim has been tested.

Revocation is not undo

Withdrawing authority stops future reliance. It may not reverse effects that were already triggered before the revocation propagated.

Classification depends on deployment

The same model can sit at different horizons in different harnesses. A classification applies to a deployment, not to a model in the abstract.

Draft frameworks will change

OCC-ASF, AIH-12 and PACTE are v0.1 drafts. Names, levels and requirements may change in response to review.

Benchmarks are not horizons

A system does not reach a higher horizon merely because it produces impressive text or scores highly on a benchmark.

Single-steward origin

The standards were drafted by one organisation and are moving to independent stewardship. Until the Foundation is constituted, that dependency is real and disclosed.

Claim discipline

How to describe your conformance

SayDo not say
“Self-declared conformance with F-ACT 1.0 at GUARD 2.”“F-ACT certified.”
“Assessed using the draft PACTE method (v0.1).”“PACTE approved.”
“Classified at AIH-12 H5 for this deployment.”“H5-safe” or “rated safe”.
“Participating in OCC review.”“Endorsed by OCC.”
Status vocabulary

The words a registry entry may carry

Proposed for the registry and the planned Agent Lifecycle profile. Words such as “certified”, “approved”, “safe”, “compliant” and “trusted” are deliberately absent.

Registered
An entry exists. Nothing has been checked.
Self-declared
The implementer states conformance and has published its declaration.
Under review
Evidence has been submitted and is being examined.
Pilot assessed
Assessed within a bounded pilot, under stated conditions.
Independently reviewed
Reviewed by a party independent of the implementer.
Conditions attached
Accepted subject to stated limits or remediation.
Suspended
Temporarily not relied upon pending investigation.
Withdrawn
No longer valid; withdrawn by the implementer or the register.
Expired
Past its validity period and not renewed.